KUNUNURRA STANDBY BORE & COLLECTOR MAIN.
The Water Corporation standby bore & collector main project was completed at the end of 2017. The project was to upgrade the current existing bore field with a new bore & collector main providing a 4500 kl/day as additional back up to the existing bore field. The project was managed by Watercon using local sub contractors for the civil & fencing content along with specialist trades from Perth.
Watercon Scope of Works.
- Bulk earthworks of bore site & access roads.
- Installation of bore pump
- Supply & installation of concrete bore pad.
- Supply & installation of the stainless steel bore head works & casing.
- Supply & installation of 250 PE bore collect.
- Supply & installation of the 250 PE bore ring main.
- Connection the the existing water main/bore collector main & pumping station.
- Supply & installation of site compound fencing & gate including signage.
- Supply & installation of overhead HV power.
- Supply & installation of buried HV power.
- Supply & installation of electrical switchboards.