KUNUNURRA STANDBY BORE & COLLECTOR MAIN

  • Client
    Water Corporation
  • Location
    KUNUNURRA (WA)
  • Value
    $1.1M
  • Year
    2017

KUNUNURRA STANDBY BORE & COLLECTOR MAIN.

The Water Corporation standby bore & collector main project was completed at the end of 2017. The project was to upgrade the current existing bore field with a new bore & collector main providing a 4500 kl/day as additional back up to the existing bore field. The project was managed by Watercon using local sub contractors for the civil & fencing content along with specialist trades from Perth.

Watercon Scope of Works.

  • Bulk earthworks of bore site & access roads.
  • Installation of bore pump
  • Supply & installation of concrete bore pad.
  • Supply & installation of the stainless steel bore head works & casing.
  • Supply & installation of 250 PE bore collect.
  • Supply & installation of the 250 PE bore ring main.
  • Connection the the existing water main/bore collector main & pumping station.
  • Supply & installation of site compound fencing & gate including signage.
  • Supply & installation of overhead HV power.
  • Supply & installation of buried HV power.
  • Supply & installation of electrical switchboards.